AUDIO VISUAL INSTALLATION
Commercial AV installers for meeting rooms, boardrooms, lecture theatres, signage and venues across the UK, from a single room to a multi-site rollout.
QUICK REFERENCE
Strive AV is a UK audio visual installation company. Its own engineers and vetted partner engineers install meeting rooms, Microsoft Teams Rooms, boardrooms, lecture theatres, digital signage, video walls and audio systems, from a single room to multi-site rollouts. Typical installed costs are £3,000 to £8,000 for a huddle room, £8,000 to £20,000 for a meeting room and £25,000 to £60,000+ for a boardroom. ISO 27001, 9001 and 14001 certified, with a fixed-price quote after a free site survey.
AV installation costs in the UK
| What you need | Typical installed cost |
|---|---|
| Huddle room (3 to 5 people) | £3,000 to £8,000 |
| Standard meeting room (6 to 12 people) | £8,000 to £20,000 |
| Boardroom or large conference room (12 to 20+) | £25,000 to £60,000+ |
| Digital signage, per screen | £500 to £4,000 |
| LCD video wall (dvLED from £20,000) | £6,000 to £35,000 |
| Background music, per zone | £1,500 to £4,000 |
Indicative UK installed prices including equipment, cabling, commissioning and handover. Hardware costs the same everywhere; central London labour runs 10% to 25% above the regions. How meeting room installation is priced.
AT A GLANCE
- Typical install time
- Huddle room 1 to 2 days, meeting room 3 to 5 days, boardroom 1 to 2 weeks
- Multi-room rollouts
- 4 to 12 weeks, phased around your building
- Engineer day rates
- £350 to £500 in the regions, £450 to £650 in central London
- Certifications
- ISO 27001 · 9001 · 14001 · AVIXA member
RECENT PROJECTS
AV installations Strive AV has delivered

One Exchange Square, Broadgate
Q-SYS audio with Bose speakers across the receptions, amenity floor, end-of-trip changing rooms and 10 lifts of a City of London office building.

Stanhope PLC, 8 Bishopsgate
Seven meeting rooms and a breakout and events space with Q-SYS audio and digital signage, fitted out for Stanhope's move to 8 Bishopsgate.

Paddock Secondary School: New Build Split Hall
Epson laser projection, Q-SYS control, JBL distributed audio and SMART Boards in a new-build hall that splits into two spaces.

Cardiff Metropolitan University: Cyncoed Lecture Theatre
Dual Epson laser projectors, Wolfvision wireless sharing, Extron control and Sennheiser microphones with assistive listening in a campus lecture theatre.

Grand Hotel Leicester
Kings Hall, Queens Hall and the meeting rooms: MAXHUB interactive displays, QSC audio with JBL line arrays and wireless presentation.

University in London: New West London Site
Booths, pods, meeting rooms, a boardroom and signage across a new university site, with Logitech Rally Bars, LG screens, Q-SYS audio and Crestron control.

The Eades, Walthamstow
A networked Q-SYS audio and video system across reception, corridors, lifts, gym and co-working space in a 495-apartment build-to-rent development.
Also installed for
- ✓Cardiff Metropolitan University: 32 teaching rooms upgraded across all campuses in one summer
- ✓Queen Elizabeth II Centre: dual 4K 15,000 lumen Panasonic projectors in the Mountbatten event space
- ✓Uxbridge College: a 136-inch ViewSonic direct view LED display for the security operations centre
- ✓Farringdon Community Academy: a 3.6 m LED wall and JBL audio in the atrium
- ✓Grace College: BenQ interactive touchscreens and wireless presentation in an open-plan science area
What our clients say
“Our packed summer install schedule of 32 rooms was successfully carried out with the kind of expert precision and eye for detail only Strive can provide. Our timescales and turn around were tight for this project but Strive took this in their stride and completed this project to their usual high standard. From last minute changes and delivery delays, to supply chain issues Strive handled everything without complaint and delivered everything to the deadlines given.”
Hollie Carter
AV Manager, Cardiff Metropolitan University
“I've had the pleasure of working with Strive AV on my last two projects, most recently The Eades in Walthamstow, and they've been fantastic from start to finish. Their professionalism, expertise, and attention to detail made everything run so smoothly... Strive AV are exactly the kind of company you want on your team: reliable, creative, and just genuinely great people. I wouldn't hesitate to recommend them.”
Richard Millman
Quantity Surveyor, DuBoulay Projects, The Eades, Walthamstow
WHERE WE WORK
AV installation across the UK
Designed and project-managed from our East Grinstead head office and installed by our own engineers and vetted local partner engineers.
AV Installation FAQs
Q.How long does AV installation take?
Once the equipment is on site, a huddle room takes 1 to 2 days, a standard meeting room 3 to 5 days and a boardroom 1 to 2 weeks. Multi-room rollouts are phased over 4 to 12 weeks. Hardware lead times usually set the start date: displays and video bars arrive in 1 to 3 weeks, DSP and large-format kit in 4 to 8 weeks and dvLED in 8 to 16 weeks.
Q.How much does AV installation cost?
A huddle room typically costs £3,000 to £8,000 installed, a standard meeting room £8,000 to £20,000 and a boardroom £25,000 to £60,000+. Hardware costs the same across the UK; central London labour runs 10% to 25% above the regions, with engineer day rates of £450 to £650 against £350 to £500 elsewhere.
Q.What is included in an AV installation?
A site survey, equipment supply, cabling and containment (or coordination with the M&E contractor), rack build, display and speaker mounting, termination, control programming, commissioning, user training, as-built documentation and a defects period. Strive AV quotes a fixed price for the whole scope after the survey.
Q.Do you install AV outside London and the South East?
Yes. Projects are designed and managed from the East Grinstead head office and installed across the UK by Strive AV engineers and vetted local partner engineers. Recent installations include the City of London, Cardiff, Leicester and Hertfordshire.
Q.Can AV be installed out of hours?
Yes. Work in occupied offices, schools and hotels is regularly scheduled for evenings, weekends and holidays so rooms stay in use. Cardiff Metropolitan University's 32-room upgrade was completed within the summer break.
Trusted AV Partner to Leading Organisations
























































