


Video Walls in Reading
From the technology employers along the Thames Valley corridor to Green Park, Thames Valley Park and the financial offices around Forbury, Strive AV designs meeting rooms, Microsoft Teams Rooms and hybrid collaboration setups for Reading's tech, professional services and corporate firms.
→Schedule a free Reading site surveyVideo Walls installation in Reading
Strive AV designs and installs LED and LCD video walls for every environment — from fine-pitch direct-view LED in corporate atria to ruggedised LCD arrays in 24/7 control rooms. We handle the full pipeline: structural mounting, processor selection, source switching, content design and ongoing maintenance.
Stunning LED and LCD video walls for receptions, control rooms, retail and event spaces — designed to command attention and deliver impact.
What’s included
Fine-pitch direct-view LED (1.2mm-2.5mm) for premium environments
LCD arrays with ultra-thin bezels for control rooms and command centres
Datapath, Christie and AMX video processors with multi-source switching
Bespoke structural mounting and acoustic treatment where required
Pricing
LCD video walls typically £25,000-£80,000 depending on size and configuration. Fine-pitch LED video walls £60,000-£250,000+ for corporate atria and broadcast environments.
Timeline
LCD installs typically 1-2 weeks. LED video walls 2-6 weeks including structural prep, calibration and content commissioning.
Featured project

Coeo – A Premier Microsoft Teams Room Experience
Strive AV delivered one of the UK's first Microsoft Signature Teams Rooms for Coeo, creating a cutting-edge hybrid collaboration space that showcases Microsoft technology excellence.
Read full case study →




