Lecture Theatre AV Upgrade for a London University
Lecture theatre AV for a London university: twin Epson laser projectors, Sennheiser ceiling mics, Q-SYS AV-over-IP and PTZ cameras for hybrid teaching.
Quick reference: Lecture theatre for more than 100 students at a London university, one of three on a refurbished teaching floor: 2 Epson EB-PU1008B laser projectors, 2 NEC 75-inch repeater displays and a 43-inch confidence monitor, Q-SYS Core 8 Flex with NV-32-H AV-over-IP, 4 Sennheiser TeamConnect Ceiling 2 mics, Shure MXW neXt wearables and a Catchbox, 2 QSC NC-12x80 PTZ cameras, 18 pendant speakers, Crestron Flex for Zoom Rooms, handed over 30 September 2025.
A large lecture theatre for a London university








The challenge: a delayed refurbishment and a six-week install
Key Requirements
- •Twin-image projection for side-by-side content in a large lecture theatre
- •Clear sightlines for side seats through repeater displays
- •Ceiling microphone coverage plus wearable and throwable mics for hybrid teaching and recording
- •PTZ cameras and a Zoom Rooms system for remote participants
- •Assistive listening for hearing-impaired students
- •One touch panel and a height-adjustable lectern any lecturer can use
- •Installation compressed around a delayed main contractor programme
Twin projection, ceiling microphones and Q-SYS
| Space | Rooms | What was installed |
|---|---|---|
| Lecture theatres | 3 | Twin Epson laser projection, Q-SYS AV-over-IP, two QSC PTZ cameras each, Shure MXW neXt wearables, Catchbox and assistive listening |
| Lecture theatres 1 and 2 | 2 of the 3 | Also two NEC 75-inch repeaters, a 43-inch confidence monitor, four Sennheiser TeamConnect Ceiling 2 mics and a Q-SYS Core 8 Flex |
| Small teaching rooms | 5 | Speakers and additional Q-SYS equipment |
| Study booths | 4 | LG 32-inch screens |
Featured Solution
Twin laser projection
Two Epson EB-PU1008B laser projectors side by side, with NEC 75-inch repeaters for the side seats and a 43-inch confidence monitor.
Ceiling, wearable and throwable mics
Four Sennheiser TeamConnect Ceiling 2 arrays, two Shure MXW neXt wearables and a Catchbox, mixed on a Q-SYS Core 8 Flex.
Hybrid teaching
Two QSC NC-12x80 PTZ cameras, Magewell capture and a Crestron Flex kit for Zoom Rooms.
Q-SYS AV-over-IP and control
NV-32-H and NV-21 network video endpoints, a Lightware Taurus UCX lectern switcher and a Q-SYS 10-inch touch panel.
Questions about lecture theatre AV
Q.What AV does a university lecture theatre need for hybrid teaching?
At minimum: a camera framing the lecturer, microphones that pick up both the lecturer and audience questions, a route into the lecture-capture or video platform, and displays everyone in the room can read. In this London university theatre that meant two QSC PTZ cameras, four Sennheiser ceiling arrays plus wearable and throwable mics, a Crestron Flex kit for Zoom Rooms, twin projection with repeater screens and one Q-SYS touch panel to run it all. More on how we approach these rooms: lecture theatre AV.
Q.Why use ceiling microphones instead of lectern goosenecks in a lecture theatre?
A gooseneck only works when the lecturer stays at the lectern and speaks into it. Ceiling arrays cover the teaching area wherever the lecturer stands and can be zoned to pick up audience contributions, which matters for recordings and remote students. This theatre uses four Sennheiser TeamConnect Ceiling 2 arrays, with Shure wearable mics for the lecturer and a Catchbox for questions as well. See our audio systems page for how ceiling microphones and speaker coverage are designed.
Q.Do you need twin projection or repeater screens in a large lecture theatre?
Twin projection lets lecturers show two sources side by side, for example slides next to a visualiser. Repeater displays solve a different problem: seats at the sides that can't read the main screens comfortably. Deep or wide rooms often need both, which is why this theatre pairs two Epson laser projectors with two NEC 75-inch repeaters.
Q.How long does a lecture theatre AV upgrade take?
On this project first fix ran in July 2025, the main install started on 18 August, the systems were programmed and commissioned in the week of 22 September, user acceptance testing ran on 29 September and the first lecture theatre was handed over on 30 September: about six weeks from the start of the main install to the first handover. Most universities plan this work around the summer vacation, so survey, design and equipment lead times need to be worked back from the install window.